Interactive Instruments · Pollanen (2026)

The Certainty
Bound

Certainty Bound Diagnostic
Given prior probability, significance threshold, power, and reliability target, computes the positive predictive value, the infeasibility index Ψ, and the structural regime.
PPV = πΛ / (πΛ + 1−π) Ψ = Λ_req / Λ Λ_req = (τ/1−τ)·(1−π)/π Ceiling = π / (π + α(1−π))
Prior probability π
0.10
Significance α
0.050
Power 1−β
0.80
Target reliability τ
0.95
τ
PPV
Infeasibility index Ψ
Leverage Λ
Required leverage
Ceiling PPV
Critical prior πcrit
Min. α for feasibility
Adjust the parameters above to diagnose the reliability regime.
Replication Pipeline
The minimum pipeline depth k* required to achieve target reliability τ. Leverage compounds multiplicatively: Λk = ((1−β)/α)k.
Λ^(k) = Λ^k α^(k) = α^k PPV(k) = πΛ^k / (πΛ^k + 1−π)
Prior π
0.10
Significance α
0.050
Power 1−β
0.80
Target τ
0.95
Single-study PPV (k = 1)
Min. pipeline depth k*
Pipeline α at k*
Pipeline leverage at k*
kα^kPower^kΛ^kPPV≥ τ?
Adjust parameters above.
Reliability Landscape
The feasibility boundary Ψ = 1 on the (Λ, π) plane. Plot your own field alongside calibrated reference points from the literature.
Field name
Prior π
0.150
Significance α
0.050
Power 1−β
0.80
Majority-false
Infeasible
Feasible
Your field
Feasibility boundary (τ = 0.95)
Majority-false boundary
Adjust the sliders to place your field on the landscape.